How does HOA approval work for a driveway or patio in Kingwood or Atascocita?

Master-planned associations commonly want to see the plan before new exterior concrete goes in. You send an application to the architectural committee, and it either signs off or asks for something different. In Texas associations with more than 40 lots, once the developer steps back, a “no” can be appealed to the board. Getting that sign-off before the forms go up is almost always cheaper than arguing about it afterward.

Kingwood and Atascocita take different routes to the same committee

Kingwood has been part of the City of Houston since 1996. A driveway there usually needs a city permit and a village association’s approval. Houston’s own permit application spells out how they relate: a city permit doesn’t authorize work that violates your deed restrictions, and building in violation of them makes the permit void. The city’s yes doesn’t settle it.

Atascocita is unincorporated Harris County, so for most homes there’s no city permit office to visit. The county still has rules for right-of-way driveways and floodplain work. Past that, the committee is often the only approval you’ll wait on, which makes it the one that sets your schedule.

Stamped concrete patio in an ashlar slate pattern behind a home
Our crew's work from around greater Houston.

Find the rules before you draw anything

Your association’s rules live in its dedicatory instruments: the declaration and any architectural guidelines. Texas law requires a property owners’ association to file those in the real property records of the county where the property sits, and an instrument that isn’t filed has no effect. Part of Kingwood crosses into Montgomery County, so depending on the lot, the records may live in either county.

There’s usually an easier way. An association with at least 60 lots, or one that uses a management company, has to post the current version of its filed dedicatory instruments on a website members can reach. Ask your management company for the portal login and read the architectural section before anyone quotes you a finish.

What a committee needs to see

Every association writes its own form, and we won’t guess at yours. The questions behind those forms don’t change much, though: where the concrete goes, how big it is, what it will look like, and where the water runs off it. A package that answers them plainly tends to move faster. Here’s what goes into ours:

  • A dimensioned drawing of the work on your lot, with distances to the property lines
  • The spec: thickness, steel, base, and joint layout
  • A site plan showing where the water goes
  • A finish description with color and edge details

Drainage deserves more attention than it gets. A new patio or a wider driveway adds hard surface, and a neighbor’s yard is exactly the kind of thing a committee is there to protect.

Committees also keep their own calendars. If yours meets once a month, the pour date gets planned around that meeting, not the other way round.

If the committee says no

Start by asking what would change the answer. Sometimes a denial comes down to one detail, say a border color, and a redraw fixes it.

If talking doesn’t get there, Section 209.00505 of the Texas Property Code gives you a formal route. It applies to associations with more than 40 lots, once the developer no longer appoints the committee or holds a veto over it. Under that section:

Section 209.00505, step by step

  • The denial has to come in writing, by certified mail, hand delivery, or electronic delivery. It must describe the basis for the denial and tell you that you can ask the board for a hearing.
  • You request the hearing within 30 days of that notice.
  • The board holds it within 30 days of receiving your request and gives you at least 10 days’ notice. Only one hearing is required.
  • Either side can postpone once for up to 10 days, and more if both agree. Either side can make an audio recording.
  • The board can affirm, change, or reverse the committee’s decision, consistent with the declaration.

One more detail from that section: in those associations, a current board member, a board member’s spouse, or someone living in a board member’s household can’t sit on the architectural committee.

That’s general information, not legal advice. Your association’s documents and a Texas real-estate attorney can tell you how it applies to your lot.

What we bring to the committee

For HOA work, we build the committee package from the same spec we quote against, and the drawing work shows up as its own line so you can see what it costs. We plan the pour date after the approval, not before it. In Kingwood the city permit is its own step; our Houston permit guide covers who can pull it. HOA approval sits on top of the county and city rules laid out in our Harris County permit guide.

Whether it’s a new patio or a wider driveway, send the address and your association’s name through the quote page.

Statutes and association rules change. We last checked the Texas Property Code sections above in September 2026. This is general information, not legal advice.

Sources

  1. Texas Property Code Section 209.00505: architectural review authority (statutes.capitol.texas.gov)
  2. Texas Property Code 209.00505, full text (public.law) (texas.public.law)
  3. Texas Property Code Section 202.006: dedicatory instruments filed in county records (statutes.capitol.texas.gov)
  4. Texas Property Code Section 207.006: dedicatory instruments posted online (statutes.capitol.texas.gov)
  5. Houston Permitting Center: Sidewalk-Driveway permit application, form CE1023 (deed restriction warning) (houstonpermittingcenter.org)
  6. City of Houston: Super Neighborhood 43, Kingwood Area (houstontx.gov)
  7. Harris County Engineering: Permits FAQ (oce.harriscountytx.gov)

Page updated 2026-09-30. For your own job, whoever has jurisdiction sets the rules, and your written quote sets the price.